Cost
What is the cost to build the Environmental Education Centre?
| Preparation Work |
| site scraping and trenching |
$ 1,743.54 |
| *electrical |
$ 1,979.50 |
| *brisbin survey |
$ 649.70 |
| *soil bearing |
$ 160.50 |
| ATCO gas- moving of the line |
$ 1,495.99 |
| electrical |
$ 123.05 |
| Total |
$ 6,152.28 |
| NOTE: * These items were not included in the grant. |
Building
| Walls |
| straw bales |
$ 848.00 |
| interior walls |
$ 347.79 |
| stucco cement |
$ 1,477.60 |
| exterior flashing |
$ 106.19 |
| interior wall framing |
$ 182.54 |
| home depots |
$ 6,000.00 |
| drywall |
$ 1,067.84 |
| drywall clips |
$ 135.45 |
| insulation |
$ 192.60 |
| drywall mud |
$ 140.70 |
| material |
$ 2,246.51 |
| Total |
$ 12,745.22 |
| Windows & Doors |
| Exterior windows & doors |
$ 9,883.53 |
| Roof |
| roof trusses |
$ 2,793.00 |
| metal roof |
$ 4,584.68 |
| roofing felt |
$ 196.45 |
| forms |
$ 53.50 |
| gable vents |
$ 56.11 |
| eaves troughing |
$ 1,712.00 |
| roofing material |
$ 1,584.34 |
| eaves troughing - installment |
$ 2,354.00 |
| roofing labour |
$ 410.88 |
| Total |
$ 13,744.96 |
| Labour Cost for the Construction of the Building |
| |
$ 31,633.81 |
| WCB |
$ 966.18 |
| WCB |
$ 966.18 |
| Total |
$ 33,566.17 |
| Plumbing |
| |
$ 64.75 |
| |
$ 572.02 |
| |
$ 1,175.87 |
| |
$ 3,953.28 |
| Total |
$ 5,765.92 |
| Electrical |
| |
$ 1,000.00 |
| |
$ 642.00 |
| |
$ 535.00 |
| |
$ 52.14 |
| |
$ 1,979.50 |
| |
$ 1,722.70 |
| |
$ 3,284.90 |
| Total |
$ 9,216.24 |
Solar Systems
| Heating |
| heating material |
$ 185.18 |
| plumber |
$ 953.87 |
| solar collectors |
$ 6,968.00 |
| radiant piping |
$ 249.00 |
| plumbing for in floor radiant heating |
$ 3,060.20 |
| valve/actuator switch |
$ 743.65 |
| ground pump |
$ 98.05 |
| pump |
$ 190.00 |
| solar collector fittings |
$ 363.68 |
| Installation of Solar heating system |
$ 2,589.75 |
| parts for display board |
$ 504.66 |
| solar wall |
$ 428.00 |
| Total |
$ 16,334.04 |
| Electricity |
| photovoltaic cells (p.v.) installation |
$ 256.80 |
| power pool |
$ 150.00 |
| photovoltaic cells (p.v.) |
$ 20,600.40 |
| electrical |
$ 1,500.00 |
| Utilicorp-meter |
$ 728.22 |
| Total |
$ 23,235.42 |
| Equipment |
| propane heater |
$ 35.31 |
| sprayer |
$ 718.95 |
| mixer & wheelbarrow |
$ 450.53 |
| crane rental |
$ 190.55 |
| mortar mixer |
$ 757.24 |
| bale needles |
$ 157.05 |
| ceramic cutter |
$ 85.60 |
| mechanical equipment |
$ 231.46 |
| Total |
$ 2,626.69 |
| Potable water |
| cistern |
$ 428.00 |
| water filter |
$ 1,020.00 |
| Total |
$ 1,448.00 |
| Insulation in the attic |
| material |
$ 2,620.00 |
| installation |
$ 4,275.00 |
| Total |
$ 6,895.00 |
| Paint |
| exterior |
$ 681.91 |
| vapour paint |
$ 360.00 |
| interior paint |
$ 1,624.65 |
| bituthene (exterior) |
$ 353.10 |
| Total |
$ 3,019.66 |
| Painting of the floor |
| |
$ 300.00 |
| |
$ 1,265.84 |
| Total |
$ 1,565.84 |
| Other items |
| grab bar |
$ 25.38 |
| glass |
$ 59.47 |
| ceiling fan |
$ 10.00 |
| toilet |
$ 230.00 |
| maple leaf flooring |
$ 1,200.00 |
| spirovent |
$ 155.00 |
| HRV |
$ 1,096.00 |
| HRV installation |
$ 1,879.73 |
| Total |
$ 4,655.58 |
| Other Costs |
| rental fence |
$ 104.33 |
| reconstruction of fence |
$ 2,504.87 |
| donation sign |
$ 839.95 |
| shipping freight |
$ 10.70 |
| locates (power lines, gas line) |
$ 74.90 |
| business licence |
$ 442.57 |
| blue prints |
$ 130.00 |
| insurance |
$ 200.00 |
| Total |
$ 4,307.32 |
| Consulting Firm |
| Project Manager |
$ 16,050.00 |
| Construction Manager |
$ 13,910.00 |
| Design Fee |
$ 10,165.00 |
| As Built Drawing |
$ 2,675.00 |
| Travel Expense |
$ 1,000.00 |
| Total |
$ 43,800.00 |