This project consists of twinning Yankee Valley Blvd from Bayside Gate/Chinook Winds Drive to 24 Street to a four lane divided standard.

Phase 1 consisted of the Earthworks and was completed in Winter 2016. Phase 2 consisted of building the roadway and is complete. Phase 3 consists of landscaping and may be extended to the spring of 2018.

Future traffic signals on Yankee Valley Blvd at Bayside Blvd. as well as Yankee Valley Blvd at Bayview St are expected to be in operation by the end of November 2017.

Speed has been increased to 60km/hr, however residents are asked to use caution in the area and obey construction signage.

Project update: Minor landscaping and pathway to be completed in spring 2018.

 