Requests MUST be received a minimum of two (2) business days in advance of the work being performed.
The following is required to ensure this work in accordance with Waterworks Bylaw B30/2016, City of Calgary Standard Specifications Waterworks Construction (current edition), and City of Airdrie General Design Standards & Construction Specifications (current edition). Failure to do so may result in fines.
The City of Airdrie will contact the individual listed below to schedule the appointments.
This is NOT the appointment date/time until confirmed by a City employee.
The City of Airdrie will determine which valves will be operated. It is the responsibility of the Requestor to clearly describe the work being requested. Failure to do so will result in the requested work being denied or delayed.
Delete
The information on this form is collected under the authority of Section 33(c) of the Freedom of Information and Protection of Privacy Act ("the Act") and will be used solely for purposes relating to the administration of the Water Mainline Valve Operation Program.
It will be treated in accordance with the privacy protection provisions of Part 2 of the Act. Questions concerning collection of this information can be directed to The City of Airdrie at 15 East Lake Hill NE, Airdrie, Alberta T4A 2K3 or at 403.948.8871.