Temporary Road and Lane Closures

Main Street Lane Closure - Sept. 17 - Nov. 14

Please be advised that the Capital Projects Office will be commencing with remediation of the historic landfill site located on Main Street. This project solidifies the City’s commitment to sustainable communities. The scope of work includes removal of the roadway and sidewalks in order to access the historic landfill. The waste material and any contaminated soil will be removed and disposed of according to provincial regulations.

Private property will be accessible at all times and maintained by the contractor via traffic signs. I have attached a map for reference.

Engineering has reviewed and approved the Traffic Accommodation Strategy. Two-way traffic (see attached) will be used to accommodate construction traffic and will be relocated from the north bound lanes to the south bound lanes as required. Flagging personnel will be onsite, please drive cautiously through the area.

If you have any questions or concerns, please contact Capital Projects at capital.projects@airdrie.ca or 403-948-8800 ext. 8468.

24th Street Road Closure - Sept. 4 - Nov. 5

UPDATE: 24th Street will be open to the public on November 6.

The Capital Projects office has completed the roadway widening of 24th Street south of Yankee Valley BV. The scope of work included a new two-lane paved roadway, deep utility installation, pathway construction and earthworks. The new two-lane paved roadway includes the first 400m of 24th Street (south of Yankee Valley BV) and the earthworks will continue for another 800m further south. The earthworks is in preparation for future roadway widening.

*Be cautious when utilizing 24th Street as workers will be present completing site clean-up and preparing for winter close-out.

If you have any questions or concerns, please contact Capital Projects at capital.projects@airdrie.ca or 403-948-8800 ext. 8468.

8th Street Lane Closure between Veterans Blvd and 1st Ave - Aug. 24 - Nov. 8

Please be advised there will be a temporary lane closure on 8th street between Veterans Blvd and 1st Ave. The contractor will only be closing portions of the road that are required to complete the work (the entire length will not be closed at the same time).

If you have any questions or concerns, feel free to contact Engineering Services at engineering.services@airdrie.ca or 403-948-8835.

Veteran's Boulevard - Temporary West Bound Roaming Lane Closures - Aug. 27 - Nov. 9

UPDATE: The Capital Projects Office has completed construction of the new pathway on Veterans BV. The scope of work included a new pathway on the north side between Edmonton Trail (QEII) and 8th Street, see the attached detailed drawing for reference.

Included in the scope of work is a new signalized pedestrian crossing over CP Rail tracks and a new pedestrian crossing at Nose Creek. The Nose Creek crossing is adjacent to Veterans BV, not a new bridge over the creek.

If you have any questions or concerns, feel free to contact Capital Projects at capital.projects@airdrie.ca or 403-948-8800 ext. 8468.

40th Avenue - between Kings Heights Way & Kingsview Blvd SE

UPDATE: Sharp Hill Way is now open. Minor cleanup and landscaping is required.

Please see project website for complete details. For more information please contact project manager Adam Carroll at adam.carroll@airdrie.ca or 403-948-8800 ext. 8468.

Centre Avenue Road Closure - Aug. 21 - Oct. 31

Underground water and sanitary sewer upgrades are required along Centre Avenue between Main Street and Edmonton Trail. The project will begin Tuesday, Aug. 21 at Main Street and will move east, one block at a time. The estimated completion date is Oct. 31, 2018, weather dependent.

  • *DATE AND LOCATION EXTENDED* Sept. 7 until further notice - Centre Avenue between Main Street and Smith Street will be closed until further notice. Please see the attached map for location detail.

During the closure, there will not be any vehicle access to the properties identified. If you have any questions or concerns, please contact City of Airdrie Water Services at water.services@airdrie.ca or 403-948-8415.

*EXTENDED UNTIL FURTHER NOTICE* Centre Avenue/Albert Street Road Closure - Sept. 11

The intersection of Centre Avenue and a portion of Albert Street will be closed from Sept. 11 until further notice. The closure, which was initially scheduled for Sept. 11 only, was extended by the contractor due to weather. Please see the attached map for location detail.

If you have questions or concerns please contact City of Airdrie Water Services at 403-948-8415 or water.services@airdrie.ca.



 

2018 Road Construction

Engineering Services oversees annual road improvement and rehabilitation projects. These improvements are based on growth and economic feasibility. Rehabilitation projects are determined with the help of our pavement management system.

The 2018 Engineering Capital Projects map outlines the City's major projects for the year. Click on the links below to learn more.


40 Ave (Reynolds Gate to Main Street) update

40 Avenue between Reynolds Gate and Main Street opened on November 29, 2017. 

 