Pathway closures

Bayside

The Bayside pathway shown in this map will be closed during construction and reconfigurations as part of the Bayview/Bayside neighbourhood structure plan amendment. During phase 12 of the plan, which will begin imminently, a bridge will be built over the canals and pedestrian traffic will eventually be rerouted over the bridge. Conceptual plans for the neighbourhood structure plan can be seen here.

 

 

Contact us


Parks

P. 403.948.8400

F. 403.948.8403