Water valve operation request

Requests MUST be received a minimum of two (2) business days in advance of the work being performed.

The following is required to ensure this work in accordance with Water Works Bylaw B30/2016, City of Calgary Standard Specifications Waterworks Construction (current edition), and City of Airdrie General Design Standards & Construction Specifications (current edition). Failure to do so may result in fines.